Specifications include, but are not limited to: Replace Metal Roofs Shown in red in RFB picture at Northland Pioneer College, Little Colorado Campus located 1400 E. Third Street, Winslow, AZ ; Removal and disposal of 4 existing roof top Evaporative coolers, Labor and Materials for the removal, disposal, and replacement of the existing main roofing system with preformed 24 Gauge metal Snap Lock Panels, flashing required to weatherproof the system (ridge, hip, valley, cleat, eave, rake wall, rake edge, apron, inside corner, outside corner, gutter, downspout, drip sill, end wall, and other miscellaneous flashing), related accessories necessary for attachment of the roofing system, all butyl tape and sealant used in conjunction with the roofing system, and necessary attachment hardware as required to meet the performance standards and complete the roofing enclosure; pecific Operations 1. The Main Metal roof system is believed to be a No deck No Plywood system. Contractor to validate type, style, and roof construction layering of existing roofing prior to submitting Contractors bid to Validate Scope of Work. If Scope of work does not match the existing Roof system. Contractor to notify NPC Construction Representative to modify scope prior to submitting bid. 2. Remove and Dispose of four existing roof top Evaporative coolers. 3. Remove existing gutters, downspouts, flashing, trim, roof curbs, pipe boots, metal roof panel system as needed. 4. Removed roofing materials and roofing debris to be hauled off and disposed of by contractor. 5. Only remove as much of the existing metal roof system as you can safely put back in a days’ time. No areas of roof to be left open overnight. 6. Install new prefinished 24-gauge steel standing seam panel system with concealed clips and fasteners. Exposed fasteners in roofing panels will not be accepted. 7. Install roofing and flashing in accordance with approved shop drawings and manufacturer's product data, within specified tolerances. 8. Install new Roof Curbs and Pipe boots as required in the roof sections highlighted below in red. 9. Color of roof shall match the other roofs on site as close as possible and must be approved by NPC Construction Representative prior to order placement.