Specifications include, but are not limited to: 1. Prior to any demolition, the electrical contractor will perform a proper Lock-Out TagOut of the electrical service to the affected electrical items such as light fixtures. 2. Based on the results of the electrical tracing performed, the electrical contractor will let the contractor know which exterior circuits are active and useable for the contractor’ use during all Lock-Out periods. 3. Contractor will demolition all existing “In Scope” fixtures to be replace. The contractor must properly dispose/recycle of all construction materials from the job site. 4. Replace all existing lights one for one and add as needed to create a uniform and even lighting in the covered portion of the inspection station. Lighting must match up to the existing electrical conditions currently at the station.