Specifications include, but are not limited to: DEMOLITION OF VARIOUS BUILDINGS; 1 EA. 7210 BERNSTEIN AVE. BUILDING 13 – 10,192 SQ. FT.; 1 EA. 7210 BERNSTEIN AVE. BUILDING 15 – 10,530 SQ. FT.; 1 EA. 1620 FULLERTON ST. BUILDING 1100 – 9,726 SQ. FT.; 1 EA. 1620 FULLERTON ST. BUILDING 900 – 10,098 SQ. FT.; 1 EA. 1620 FULLERTON ST. BUILDING 600 – 13,512 SQ. FT.; 1.1 All debris or other materials resulting from the demolition of the structure(s) shall become the property of the CONTRACTOR and shall be removed from the work site within 72 hours of completion of the job. 1.2 Also, all of the Contractor’s EQUIPMENT and materials used for the Demolition must also be removed completely from the site prior to the approval of the demolition work; any Exception will require written approval from the Director of Property Standards to the Contractor. 1.3 Debris and other non-salvageable material resulting from the demolition shall be properly disposed of in a Department of Environmental Quality (DEQ) approved landfill or waste area. 1.4 Prior to final payment, CONTRACTOR shall provide proof of proper disposal of the non-salvageable material. 1.5 All material, debris, etc., resulting from the demolition shall be removed by the CONTRACTOR, at his/her cost. 1.6 All Salvageable material shall become the property of the CONTRACTOR and shall be disposed of by the CONTRACTOR in accordance with his/her wishes and desires.