Specifications include, but are not limited to: The City of Bend (City) requests proposals for the Neff Corridor Improvements design. Northeast Neff Road is identified on the GO Bond project list as one of the Citywide Key Routes for improvement. The key routes capital improvements include constructing key north/south and east/west routes for safe travel on a connected system for pedestrians and bicyclists including improvements that leverage existing bike/ped systems and fill gaps, provide off-street and on-street paths and sidewalks, provide protected and/or buffered bike lanes, connect to existing or future Bend Park and Recreation District off street paths, and/or provide sidewalk infill. R3-A: Norton Ave. NE 6th St to NE 12th St. Neighborhood greenway. Create a low-stress bikeway on NE Norton Ave (SRTS3). <-This segment is included in the Oregon Department of Transportation (ODOT) Statewide Transportation Improvement Program (STIP) for potential All Roads Transportation Safety (ARTS) funding (ODOT administered). The City intends to complete the concept level design identifying a preferred layout and handoff to ODOT for post 30% design and construction. • R3-B: Hillside Trail. Connects NE 12th to Neff Rd. Hillside path. Close sidewalk gaps and create a switchback shared use path (SRTS); includes school zone enhancements. <- This segment has been designed by ODOT (Appendix 1 for general preferred alternative). This SOW will incorporate survey and drawings, verify quantities, and include in a final bid set. • R3-C: Neff Rd. NE 12th to Big Sky Park. Shared use path adjacent to roadway; Close sidewalk gaps and create a low-stress bikeway.