Specifications include, but are not limited to: LEAD HAZARD CONTROL MEASURE #1 Item #1 Low Dust: Provide occupants protection and work site preparation in accordance with Table 8.1 of the2012 HUD Guidelines for Evaluation Control of Lead‐Based Paint Hazards in Housing. Item #2 Clean to Clearance: After completion of all lead hazard reduction activities, wet mist, fold and remove all containment polyethylene sheeting. HEPA vacuum all visible surfaces including walls, floors, ceilings and window troughs from the top down. Detergent scrub all horizontal surfaces in small sections using a 3‐bucket system, changing rinse water every 250 SF. Completely rinse with clean water and new equipment. After surfaces are dry, HEPA vacuum all visible surfaces except ceiling. ***Laundry Room window Sill W13 LEAD HAZARD CONTROL Measure #2 Item #1 Interior Cased Opening Doorway ‐ Stabilize: Kitchen Sitting Room Cased Doorway: Specifications: After establishing any required floor containment with polyethylene sheeting, mist deteriorated paint with water to the point of saturation. Wet scrape door, frame, jambs and trim on both sides with curved draw scrapers. Feather edges with a wet, 100‐grit sponge sanding block. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Spot prime and apply two coats with owner's choice of premium acrylic latex. Item #2 Window Replacement(s): Vinyl Siding ‐ Double Hung, Double Glazed Window: W12 Specifications: After establishing any required floor containment with polyethylene sheeting, wet mist, remove and wrap in polyethylene sheeting and dispose of entire existing wood window. Mist defective paint on remaining components with water to the point of saturation. Wet scrape interior and exterior casing, stool/sill, frame and associated trim. Wash with detergent solution, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Prime sill and interior window components. with top quality oil‐based primer. Prime and paint all scraped areas with premium acrylic latex top coat (color to be selected by owner). Field measure, fabricate and install a dual glazed, thermal break, vinyl sliding replacement window including all necessary painting, caulk, trim, metal and screen. Clean glass. (All windows should meet current Building Codes on placement of tempered glass windows and energy efficiency ratings.) Contractor to verify sizes before ordering windows. EMERGENCY REPAIR MEASURE #3 Item #1 Demo Floor Area for Replacement: Laundry extending approximately 30SQft into sitting room Specifications: Demo and take to an approved landfill. *Measure to include removing items from laundry room to complete work and re‐installing *Measure to include Removal and reinstallation of water heater Item #2 Repair Supply Line: Specifications: *Measure written for 5 LF of Pex. Plumbing repair to be completed at time of the floor repair. Contact CAC Project Supervisor at time of floor demo for site visit, and verification of specs for plumbing repair. * In addition the contractor will be required to take in progress photos of the plumbing repair BEFORE proceeding with the floor replacement. *Measure to be completed first, along with floor repair. *Plumbing repair to be completed first, followed by installing subfloor and covering. Item #3 Subfloor Repair/Replace: Laundry extending approximately 30 sq ft into sitting room Specifications: Repair/Replace subfloor in accordance with manufacturer and the local code office. Replace up to 203 square feet. This repair will be inclusive of all blocking and ¾ inch subfloor. Use Advantech or equal. Subfloor must be installed even with existing subfloor. CONTACT CAC IF JOIST REPAIR IS NEEDED. THE CONTRACTOR IS REQUIRED TO FURNISH CAC WITH PHOTOS OF THE DEMOLITION RESULTS AND EACH STAGE OF THE FLOORING REPAIRS WITH THE INVOICE FOR THIS WORK.