Specifications include, but are not limited to: • Examine areas and conditions in which the cubicle tracking systems will be installed. • Complete all finishing operations, including painting, before beginning installation of cubicle tracking system materials • Verify that surfaces and above ceiling supports are ready to receive work. • General: Prior to installation, clean substrate to remove dust, debris and loose particles. • General: Locate the cubicle track as indicated on the approved detail drawing for the appropriate substrate. o Tracking System o Install cubicle track, secure and rigid, and true to ceiling line. o Install end cap. o Secure track to ceiling system. Install with mechanical fasteners. o Slide carriers onto the track. o Install curtains on carriers ensuring smooth operation. • At completion of installation, remove any debris and clean surfaces.