Design efforts will look into the possibilities of right turn yields, concrete islands and a traffic signal if they are warranted, and a GDOT standard ICE analysis conducted. Also, if a traffic signal is not warranted by the ICE analysis ensure that all necessary infrastructure i.e., pull boxes, conduit, etc. are accounted for along with adequate ROW for a traffic signal in the future. Design in two phases for developing concepts for review and anticipating land purchase and R/W acquisition in phase one before performing final design in phase two. Georgia Department of Transportation Plan Presentation format will be reflected in the final design and all design shall be in accordance with the latest AASHTO, MUTCD and Georgia Department of Transportation Standards and Specifications.