Specifications include, but are not limited to: Project #1 – Council Dais and one Lectern 1. Resurfacing the Council dais, and one lectern including top and sides existing grey laminate (see figure #1 - #5). 2. Wood colored surfaces will remain as-is. 3. Covering all screw holes and sealing inserts. (see figure #4 & #5). 4. Removing pushbutton and plate (see figure #5). 5. Previously the dais had computer monitors mounted in the dais, this space has been filled with laminate. This thin line must be eliminated (see figure #5). 6. Installing fifteen (15), 3” holes with grommets and covers for monitor cords. Town would like to reuse the current grommets and caps. (see figure #4). Project #2 – Post Office Counter tops 1. The Town is looking for options to resurface the L-shaped wood countertop (see picture #6 – #9).