Specifications include, but are not limited to: Snow Melters – (Portable) – Trecan Combustion Limited (For Reference Only). 2.4.1 Equipment with operator must be available 24 hours/day, 7 days/week as required by PHL Airport. (The City shall compensate overtime rates for front-end loaders with operators only. There are no overtime rates for snow melters with operators.) 2.4.2 Required Equipment: The successful seller must be able to provide the following equipment with an operator per unit: • 7 Each: 150 tons/per hour Snow Melter • 14 Each: Front-End Loaders with four (4) cubic yard minimum capacity. NOTE: 135tph melters are not acceptable. Successfully seller must have the 7-150tph melters by the start of the contract. The City will compensate seller for requested equipment only. 2.4.3 Alternative Equipment: The successful seller may use alternate equipment of a higher capacity during the contract period if the equipment requested by PHL is not available at the time. It is the responsibility of the successful seller to provide operators with alternate (and required) equipment. Seller will NOT be compensated for alternate equipment. 2.4.4 Site Locations: This list is non-inclusive. The PHL Airport has the right to change, add, and or remove locations as needed. • Terminal A West • Terminal A East • Terminal A/B • Terminal B/C • Terminal C/D...