Specifications include, but are not limited to: Demolition and Clearing 1. The Contractor will be responsible for the demolition of commercial structures and removal of debris from the Projects’ lots. 2. The Contractor shall secure any necessary permits from local agencies and submit notifications to the Health Hazards Control Branch, as applicable, to include a Demolition Permit, any required Tree Permit and a City/County Business License. 3. The Contractor will be responsible for removing all debris and trash from the entire lot, and the lot is to be left clean of any non-natural debris and with all areas being accessible. 4. The Contractor will be responsible for all costs of transport and proper disposal of demolition debris. 5. The Contractor will be responsible for all landfill fees. 6. The Contractor is responsible for all temporary facilities necessary to successfully complete the project to include, but not limited to, portable restrooms, temporary power, temporary water, silt fencing, site security, etc. 7. Caution and care must be exercised to prevent damage to adjacent structures, and to ensure that existing businesses can operate normally without significant disruption during demolition activities. 8. Caution and care must be taken to ensure mature trees are not removed or damaged. 9. The Contractor shall provide and install all sediment and erosion control devices, practices, and structures, required in accordance with applicable South Carolina Department of Health and Environmental Control (SCDHEC) and South Carolina Department of Transportation (SCDOT) Standards. 10. Depressions greater than six (6) inches created by the demolition and removal of items specified must be graded level with adjacent land, as directed by The Owner or their designated representative. All areas where items specified have been demolished and/or removed, will be seeded as directed by The Owner. 11. Upon completion of the assigned work, The Contractor will provide written verification that all structures have been removed. 12. All materials from the sites shall be disposed of properly in accordance with all regulations. 13. No on-site burning or burying materials is permitted. 14. Demolition and Clearing for properties must be completed, no partial payment request will be accepted.