Specifications include, but are not limited to: Install a modular glass wall system spanning approximately 21.5 feet. This system will be connected to two existing walls (drywall and brick); underside of the existing ceiling grid and carpet to create a new office space. Modular system shall be demountable yet incorporate all materials and connections necessary to secure it to the aforementioned existing conditions, creating a secure, structurally safe environment. • Furnish all labor, supervision, materials, and equipment to satisfactorily perform the modular wall installation described in this Scope of Work during the times and at the frequency specified herein (the “Work”). Work is to be provided in the Slade/Garr and/or Earle Buildings at 44 Washington Street in downtown Providence. • Furnish all coordination, management, training, technical personnel, and special projects personnel as may be required during the term of the contract. These personnel shall be the direct agents and employees of the contractor, and may include, if required, a non-working resident supervisor who shall be the contractor's chief manager and agent in the performance of the services to be rendered hereunder. • Prohibit its employees from smoking and drinking alcoholic beverages in the buildings. Either activity will result in the employee’s immediate dismissal and termination from working in the Buildings.