Specifications include, but are not limited to: Excavation - Common 8,700 CY Sodding 13,000 SY Bituminous Pavement 2,350 TON Bituminous Milling 2” Depth 5,210 SY 2” Bituminous Overlay 600 TON Concrete Driveway/Walk 3,430 SY Concrete Curb & Gutter 6,125 FT Concrete Pavement Patch 1,280 SY 12” - 18” RCP Storm Pipe 1,010 FT 21” - 27” Storm Pipe 800 FT Drainage Structure (Storm Sewer) 160 FT Drainage Structure (Sanitary Sewer) 132 FT 6” - 10” PVC Sanitary Sewer 3,470 FT 6” Watermain 470 FT 10” - 12” Watermain 2,435 FT 8” Watermain (Trenchless) 620 FT Jack & Auger Steel Casing 60 FT together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Responsible Contractor Certification.