Specifications include, but are not limited to:Helicopter Lift Cost in Moab area According to Attachment B Scope of Work requirements including the following, Bids should be given on one total cost for the entire project cost. This should include all labor and materials for helicopters to lift all loads at a distance of approximately 2.73 miles, 5 miles, and 11.54 miles (1.46 miles). Bids must include all materials, fuel, and personnel, etc. necessary to complete the project. The contractor must have personnel to attach loads at each staging area and have crew members at each drop site to detach the load from the helicopter. Some sites are very remote and would require crew members to be dropped off at the installation site in order to detach loads. The helicopter should plan on an extra flight for each site to drop off and pick up their personnel.