Specifications include, but are not limited to: The scope for the feasibility study will include, at a minimum, the following tasks: 1. Define the options of how to serve the area within the boundary of the attached maps with public sewer. • The intent of Task 1 is to provide the Sewer Utility District Commission with a technical memorandum validating whether the property can be legally and practically served by public sanitary sewer. • Include a narrative of both the general layout and the location of the MIS connection for each option. If general linework showing the path can be mapped, it should be included as well. • Task 1 is not design, but shall be verified as feasible. Both gravity systems and pressure systems can be considered, but the number of lift stations and linear footage and size of pipe should be summarized in a table for each option. • Similarly, utilizing both existing right-of-way and easement acquisition within the identified parcels should be considered. • If there are any portions of the property that are not serviceable by the Mequon Sewer Utility, the consultant shall explain any and all alternatives available. • Provide pros and cons for each option. 2. Define parcels outside of the proposed area that could be served by the options in Task 1. While the focus of the current discussion is on the potential industrial zoned lands, if additional parcels could be served by the same infrastructure, the Sewer Utility may allow for further expansion of the Sewer Service Area...