Specifications include, but are not limited to: The work to be performed will be as follows: 3.2.1 Aquatic vegetation and algae control. Treatments are to be performed monthly from April to October. 3.2.2 Trash and debris removal on scheduled visits. 3.2.3 Keeping culvert and outfall structure systems clear of obstructions. REPORTS: Provide field activity reports following each treatment outlining the following: 3.3.1 Location of treatment. 3.3.2 Person performing treatment. 3.3.3 Date/Time/Length of service. 3.3.4 Types of chemicals applied. 3.3.5 Additional comments or concerns the company may have for a particular property. 3.4 ALGAE AND VEGETATION CONTROL: Ninety percent (90%) of the pond surface shall be free of algae bloom and other aquatic vegetation for a period of thirty (30) days. If such control is not achieved, the vendor shall return for an additional application of herbicide/algaecide product as determined appropriate by the vendor at no additional cost to the Owner within any thirty (30) day period that the contract is in effect...