Work to be done shall consist of the construction of a permanent 2,000 GPM deep well and furnishing all products and performing all labor necessary to construct the Chemical Feed Building, Well Enclosure Building, Chlorine Storage Building, and Fluoride Storage Enclosure described herein. Construction shall consists of the installation of a new deep well to the depth and diameter as required in the Construction Drawings and Technical Specifications. In general, the well construction will include drilling a 36” Dia. Hole, installing 30” permanent casing, 250-HP Vertical Turbine Pump, motor, valves, yard piping, painting, videotaping, logging and performing a 24-hour pump test, site work, electrical and all other appurtenances necessary to complete the Work as described in the Construction Drawings and Technical Specifications. Minimum depth of the well is expected to be +/- 500 feet. The work will be awarded in one (1) contract with a contract time of 360 days.