Specifications include, but are not limited to: The City requests hourly rates to perform Closed-Circuit Televised (CCTV) inspections of sanitary and storm sewers within the City of Bonner Springs for the Public Works Department. CCTV Inspection requires the Contractor to provide a detailed written report along with a DVD of the inspection. The inspection and the written report must be descriptions for the condition of the sewer pipe using National Association of Sewer Service Companies (NASSCO) specifications (Appendix A) performed per Pipeline Assessment & Certification Program (PACP) standards including the specific date and time of inspection. The DVD must have an audio track describing the conditions found and provide footage and grade data. The CCTV inspections, estimated at sixteen-thousand (16,000) feet will be completed at several locations within the City during 2024. Rate sheets shall include an hourly rate based on a four-hour (4-hour) minimum, regardless of footage. In-field delays due to pipe obstructions will be paid at an hourly rate if the delay is longer than two (2) hours. The planned work will be scheduled monthly or bi-weekly, depending on the Wastewater Division workload. The Wastewater Division of the Bonner Springs Public Works Department will pre-clean the sewers before the inspection and have our Sewer Cleaning Jet/Vac Truck on-site during the inspection process to clean any sewer line that may be impassable for the CCTV equipment. Rates should be based on a minimum of ten-thousand (10,000) “accumulated feet” during 2024 over an eight (8) month period to begin in April.