Specifications include, but are not limited to: a) Asphalt Restoration: 1) Street Patch Repair: The Contractor will remove six inches (6") of temporary fill (typically less than 125 psi Flow-able fill concrete) from various size street patches and back-cut all sides one foot (12"). Placement of BM-2 or equivalent asphalt material shall be a minimum of three (3) lifts, to a minimum depth of six inches (6") after compaction. 2) Full Depth Repair shall consist of the removal of the existing asphalt to a minimum depth of eight inches (8"). Placement of BM-2B or equivalent asphalt material shall be a minimum of two (2) lifts to the minimum depth of six inches (6") and a final 2” surface course using BM-2 or equivalent. 3) Mill and Patch shall consist of the removal of a minimum of two inches (2") of pavement, apply tack oil, and replace with new asphalt material.