Specifications include, but are not limited to: 1 SP-1. Div.1600 Mobilization 1 L.S. 2 SP-2, MUTCD Traffic Control 1 L.S. 3 SP-3, Div.1300, SD-13-9 Asphaltic Concrete Overlay (BM2) or HMA 4,300 Ton 4 SP-4 Edge / Header Milling (0" to 2") 2,250 S.Y. 5 SP-5 Full Section Milling (2") 28,418 S.Y. 6 SP-8, SD21-11 Div.3100 Manhole Adjustment (postoverlay) 8 Each 7 SP-9, SD21-1, Div 2100 Concrete Curb & Gutter (Match exist.- Type A Typ.) 4,500 L.F. 8 SP-10, Div. 6200 Lawn Restoration (Behind Curb & Gutter repairs) 1 L.S. 9 SP-11, Div 2100, Photo Concrete Curb Inlet Transition (6' min. length) 118 L.F. 10 SP-12, Div 2100, Exht C, SD-21-3 Concrete Sidewalk/Driveway Repair 40 S.Y. 11 SP-13, Div. 10000, MUTCD Pavement Marking - 4" (White - Thermoplastic) 200 L.F. 12 SP-13, Div. 10000, MUTCD Pavement Marking - 4" (Yellow - Thermoplastic) 2,700 L.F. 13 SP-13, Div. 10000, MUTCD Pavement Marking Stop Bar (White - Thermoplastic) 3 Each 14 SP-13, Div. 10000, MUTCD Pavement Marking Crosswalk Bar (White - Thermoplastic) 17 Each 15 SP-13, Div. 10000, MUTCD Pavement Marking Turn Arrow (White - Thermoplastic) 12 Each 16 SP-14, Div. 1500, PLSS Std Survey Monument Adjustment 1 Each