Specifications include, but are not limited to: a. Contractor to supply all materials, labor, equipment, testing, and transportation necessary to service the boilers listed below: MD168120H (BFC Boiler) built in 2019; Located in the boiler Room The water level Indicator glass is dirty, and the level indicator valve is leaking. Install or repair or replace items in accordance with State law and regulations, ASME BPV Code, National Board Inspection Code and Manufacturer Specifications. MD099162H (Patterson-Kelley Boiler) built in1998; Located in Boiler Room The main fluid system pipe is leaking. The main feed water line, which feeds all boilers in the boiler room, is leaking. This needs to be investigated and the leak repaired. MD099J59H (Cleaver Brooks Boiler) built in 1998; Located in Boller Room The main fluid system pipe is leaking. The main feed water line, which feeds all boilers in the boiler room, is leaking. This needs to be investigated and the leak repaired. MD099160H (Cleaver Brooks Boiler) built in 1998; Located in Boiler Room The main fluid system pipe is leaking. The main feed water line, which feeds all boilers in the boiler room, is leaking. This needs to be Investigated and the leak repaired. MD092727V (Steel Fab Pressure Vessel) built in 1994; Located in New Wing Lobby- Men’s Room Pressure valve is not fastened/bolted to the floor. The pressure vessel should be fastened/bolted to the floor to prevent dislodging of equipment. If pressure vessel is not fastened/bolted to the floor, equipment could, while under pressure, dislodge and pose risk of injury. MD112561V (Weben-Jarco Pressure Vessel) built in 1998; Located in the Boiler Room The stop valve in the bottom drain line Is leaking. Investigate and repair leak. Pressure relief device nameplate is illegible or missing. Contact relief valve manufacturer to replace relief value nameplate. If not replaced, the capacity of the relief valve cannot be verified to be capable of relieving the total capacity of the unit in time of need.