Specifications include, but are not limited to: 1 4” depth Concrete Sidewalk form and pour (includes concrete and 4” untreated base course) SF 2 6” depth Concrete Sidewalk form and pour (includes concrete and 4” untreated base course) SF 3 24” Straight Curb and Gutter form and pour (includes concrete and 4” untreated base course) LF 4 24” Radius Curb and Gutter form and pour (includes concrete and 4” untreated base course) LF 5 24” Straight Curb and Gutter Placed with Curb Machine (includes concrete and 4” untreated base course) LF 6 ADA Ramps form and pour (includes 6” concrete, 6” untreated base course, and truncated domes) SF 7 Driveway Apron form and pour (includes 6” concrete and 6” untreated base course) SF 8 Saw Cutting 4” Depth LF 9 Saw Cutting 6” Depth LF 10 Saw Cutting 8” Depth LF 11 Saw Cutting 12” Depth LF 12 Demolition and removal of sidewalk SF 13 Demolition and removal of curb and gutter LF 14 Excavation (including truck time, haul off, and disposal of concrete to Lehi City shop) CY 15 Short load fee (less than five yards) EA 16 Mobilization per location EA 16A Description of mobilization – when is a mobilization fee charged? 17 Testing (Site specific - to be determined by City) 17A Compaction, testing done by an outside entity EA 17B Air and Slump, testing done by an outside entity EA