The Project generally consists of the following major items: 1. Supply and installation of a prefabricated pump station building, which will include three pumps not exceeding 50 HP, variable frequency drives (VFDs) for each pump, and all control components. The prefabricated building will be mounted on a concrete pad, provided by the Contractor. 2. Supply and installation of a 200 kW diesel backup generator, with associated automatic transfer switch. 3. Supply and installation all tie-ins of water piping and electrical utilities. 4. Demolition, removal and disposal of all water piping and structures, as indicated on the drawings. 5. All associated civil/sitework, piping, structural, electrical, and instrumentation work for the completion of the project.