Specifications include, but are not limited to: Based on the SOQs received in this Phase I, BHA will select respondents it deems to be prequalified in accordance with the criteria set forth in the RFQ. In Phase II, the prequalified respondents will be invited to submit bids in response to an IFB which BHA anticipates to be issued in June 2024. Only GC firms prequalified for this project in Phase I will be permitted to submit bids in Phase II. The project delivery method for construction will be design-bid-build. The site of the Project is located at 52 & 56 Chauncy Street, Boston, MA 02111. Upgrade of full building HVAC and Fire Alarm systems. Renovation of first floor public areas and full floor renovations of floors 2, 3, 4 and 5 with HVAC and Fire Alarm along with selective work as necessary for floors 6, 7, 8, 9, 10 and 11 at 52-56 Chauncy Street. The project will be phased and the building will be occupied during construction. BHA anticipates the notice to proceed (NTP) for Construction will be issued in September 2024 and construction will be completed within 365 calendar days from the date of the NTP.