Specifications include, but are not limited to: • The Contractor shall furnish all labor, materials, services, permits, insurance, and equipment which is specified, shown or reasonably implied to perform the following tasks, in accordance with local, state and federal regulations, if these tasks are required as a component of the abatement: • The removal and disposal of the following asbestos containing materials (ACM), including any existing debris: 1. Spray applied ceiling material (ACM), 2. 12x12 Floor Tile & Mastic (all layers to substrate) • The removal and disposal of the following lead containing materials, including any existing debris: 1. Tub/shower surround adhesive. • The Contractor shall remove and dispose of floor trim/cove base material prior to floor demolition. • The Contractor is responsible for all necessary items to accomplish this work to include but not be limited to obtaining and payment for all labor, materials, services, necessary permits, bonding, insurance, and transportation/disposal costs. • The requirements of this Section govern specific aspects of the administration of the Work. The Contractor is responsible for compliance of his own employees and of his subcontractors with the requirements in this Section. • The Contactor is responsible for any incidentals that may occur during construction activities as a result of Contractor/Subcontractor’s work. • The Contractor is responsible for all corrections of and changes in the Work, and for any delays resulting from his failure to conform to these requirements, and for all costs arising there from. • The Contractor shall be responsible for all means and methods required to perform the work in accordance with the Contract Documents and within the time limits established in the Contract and this Section.