Specifications include, but are not limited to: This work includes but is not limited to the removal of existing topsoil and fill materials from fields at the East Hartford high school and the installation of a softball field. Materials will be excavated and stockpiled for re-use as appropriate. Additional fill and topsoil will be brought to site and placed after excavation of existing material. Additional materials to be furnished and installed include a sand and clay/silt infield material mix, a chain link backstop, chalk lines and bases. The contractor shall be responsible for but not limited to: maintaining overall site conditions, installing and maintaining erosion control measures, installation of softball field and restoration of site.