Specifications include, but are not limited to: East of Murdock Canal Trail: Approximately 3,150 feet of 8” PVC C900 water main and fittings at an average bury depth of 4 feet to top of the pipe, including valves, fittings, water services, irrigation services, fire hydrants, and sampling station. Includes removal and rehabilitation of approximately 12,100 square yards of roadway asphalt and road base. Includes removal and disposal of existing a Pressure Reducing Vault (PRV). West of Murdock Canal Trail: Approximately 2,420 feet of 8” PVC C900 water main and fittings at an average bury depth of 4 feet to top of the pipe, including valves, fittings, water services, irrigation services, fire hydrants, and sampling station. Includes cutting and patching asphalt approximately 1,422 square yards of roadway asphalt and road base.