Specifications include, but are not limited to: site improvements and building construction to develop a new 2,495 square foot terminal building at the Burke County Airport, adjacent to the existing parking lot and aircraft apron, as shown in the construction documents. The scope of construction work includes airport terminal area site grading, site erosion control, asphalt pavement (access drive and parking lot), concrete curb and sidewalk, stormwater conveyance, site utility work (power/electric services, communications, water line and septic system), grassing and landscaping. The scope further includes the construction of a 2,495 square foot terminal building as detailed in the attached building plans and specifications/requirements for all trades and services to produce a fully functioning building facility. A further summary of the GA Terminal Building Development – site work includes contractor furnishing all labor, materials, equipment, and services to provide the following as detailed in the construction documents: 1. Establishment of a secure staging area 2. Installation of required erosion control measures 3. Preparation of the site for terminal building construction to include survey/construction staking, minor clearing and stripping of topsoil for reuse, site grading for proposed condition including hauling surplus material to the airport stockpile within the east airport limits, subgrade preparation for building foundation including fine grading and stabilization, subgrade preparation for asphalt paving and curbing, stormwater pipe and inlet installation, miscellaneous utility installation (power services, communications services, water line connection at existing well head, and installation of a new septic system), 4. Building pad preparation, including subgrade utility preparations and foundation/footing preparation 5. Asphalt paving of drive lane and parking lot with temporary and permanent/final pavement marking complete upon final curing of asphalt 6. Installation of ancillary site elements including airport terminal signage, LED parking lot lighting and 30-foot flag pole with LED lighting 7. Landscaping, grassing and removing erosion control measures 8. Final site cleanup and restoration