Specifications include, but are not limited to: : This project involves replacing the main sewage line to the Anchor East facility to eliminate the flooding caused by the current worn, rusted-out pipeline. The project's primary goal: Permanently repair the worn, rusted-out main plumbing line to the facility. The main sewage line plumbing replacement for the building will result in: 1. Successful installation of the main plumbing line. 2. Eliminate flooding from the sewage backup in all apartments affected. 3. Eliminate the need for expensive biannual line-flushing required to mitigate flooding. 4. Increase client safety, satisfaction, and comfort when residing in the facility. Location: 218 East 4500 South, Murray UT 84107