The Contractor shall disassemble the entire cabin and repair the existing foundation with like materials used for the existing foundation and front porch piers. The Contractor shall reuse the existing materials from the disassembled cabin. The Contractor shall install a new seal plate log on top of the foundation to fasten the wall to. The Contractor shall replace approximately ten 2”x6”x8’ floor joists. The Contractor shall rebuild the wall, on the left as you enter cabin, with sawmill run lumber. The four windows frames are approximately 21”x36” , with .25” plex glass, the screens are 32”x46” black vinyl screen. The Contractor shall frame the windows out and install. The Contractor shall paint the cabin to match existing color. The primer paint shall be Sherwin Williams Duration Exterior, Porter Permanizer or equal. The Contractor shall apply two coats of primer/paint.