Specifications include, but are not limited to: 1) Approximately 3.96 miles of placing and grading soil cement base including prime on St. Mark Road. The contractor will be responsible for designing soil cement mix based on test sampling of subgrade. Project begins at Hwy 19 and ends at Scotland Road. - Soil Cement base width is 26 feet and 6 inches in depth - Prime and sand 2) Approximately 3.96 miles of triple surface treatment paving on St. Mark Road using #5, #7, and #89 stones along with a Cationic Polymer Modified Rapid Curing Fog Seal. Fog seal shall be placed on project within one week of #89 stone placement. Project begins at Hwy 19 and ends at Scotland Road. - Fog Seal applied at rate of .12 gallons per SY over top of #89 stone - Approximately 55,733 SY - Pavement width is 4 feet - Temporary center line striping and permanent 5" center and edge striping