Specifications include, but are not limited to: INSTALL A NEW EXTERIOR DUPLEX SEWAGE PUMP STATION FOR THIS FACILITY. THE FACILITY OPERATES 24/7, THE NEW PUMP STATION SHALL BE TESTED AND OPERATIONAL PRIOR TO THE INTERIOR EXISTING PUMP STATION BEING TAKEN OFFLINE. ONCE THE NEW DUPLEX PUMP STATION IS ONLINE, ANY EXISTING PUMPS, POWER, PIPING, VALVES, CONTROLS, ETC. ASSOCIATED WITH THE EXISTING SEWAGE PUMP SYSTEM SHALL BE REMOVED AS INDICATED IN THE CONSTRUTION DOCUMENTS. THE EXISTING INTERIOR SUMP PIT SHALL BE FILLED AND FLOOR PATCHED TO MATCH EXISTING CONDITIONS. THE EXISTING PUMP DISCHARGE LINE CURRENTLY ROUTED THRU THE FACILITY SHALL BE ABANDONED IN PLACE. A NEW PUMP DISCHARGE LINE FROM THE NEW DUPLEX PUMP STATION SHALL BE INSTALLED. THE NEW PUMP DISCHARGE SHALL BE ROUTED AROUND THE EXTERIOR OF THE BUILDING, INTERCEPTING THE EXSTING PUMP DISCHARGE LINE BEYOND THE CURRENT PARKING AREA PRIOR TO PROCEEDING UP THE INCLINE TOWARD HIGHWAY 55 , JAMESTOWN STREET.