Specifications include, but are not limited to: 3.2 Holiday Park baseball field 1 • Holiday Park baseball field 1 has 60’/70’ bases, 70’ arc. • Lip Repair • Layout infield to dimensions. • Paint and stringline for lip removal, approximately 7,500 sq ft. • Remove elevated areas and haul away debris. • Grade to proper slope and prep for sod. • Furnish and install Big Roll Celebration Bermuda sod and roll with drum roller. • Loosen / Roto-till clay and grade infield to proper slope. Reshape pitcher mound and reset bases. 3.3 Holiday Park baseball field 2 • Holiday Park baseball field 2 has 60’ bases, 60’ arc. • Lip Repair • Layout infield to dimensions • Paint and stringline for lip removal, approximately 5,400 sq ft. • Remove elevated areas and haul away debris. • Grade to proper slope and prep for sod. • Furnish and install Celebration Bermuda grass and roll with drum roller. • Loosen/Roto-till clay and grade infield to proper slope. Reshape pitcher mound and reset bases. 3.4 Holiday Park baseball field 3. • Holiday Park baseball field 3 has 60’ bases and 50’ arc. • Lip Repair • Layout infield to dimensions. • Paint and stringline for lip removal, approximately 5,000 sq ft. • Remove elevated areas and haul away debris. • Grade to proper slope and prep for sod. • Furnish and install Big Roll Celebration Bermuda sod and roll with drum roller. • Loosen / Till clay and grade infield to proper slope. Reshape pitcher mound and reset bases. 3.5 Holiday Park baseball field 4. • Holiday Park baseball field 4 has 80’ / 90’ bases, 95’ arc. • Lip Repair • Layout infield to dimensions. • Paint and stringline for lip removal, approximately 7,600 sq ft. • Remove elevated areas and haul away debris. • Grade to proper slope and prep for sod. • Furnish and install Big Roll Celebration Bermuda sod and roll with drum roller. • Loosen / Roto-till clay and grade infield to proper slope. Reshape pitcher mound and reset bases. 3.6 Holiday Park baseball field 5. • Holiday Park baseball field 5 has 60’ bases, 60’arc, no grass infield. • Lip Repair • Layout infield to dimensions. • Paint and stringline for lip removal, approximately 5,500 sq ft. • Remove elevated areas and haul away debris. • Laser Grade and prep for sod. • Furnish and install Big Roll Celebration Bermuda sod and roll with drum roller. • Loosen / Roto-till clay and grade infield to proper slope. Reshape pitcher mound and reset bases. 3.7 Bayview Park East baseball field • East Field has 60’ bases, 50’ arc. • Lip Repair • Layout infield to dimensions. • Paint and stringline for lip removal and other uneven areas, approximately 8,600 sq ft. • Remove elevated areas and haul away debris. • Grade to proper slope and prep for sod. • Furnish and install Big Roll Celebration Bermuda sod and roll with drum roller. • Loosen / Roto-till clay and grade infield to proper slope. Reshape pitcher mound and reset bases. 3.8 Bayview Park West baseball field • West Field has 90’ bases, 95’ arc, & 60’ pitching plate and will be converted to 60’/70’ bases with a 70’ arc & 46’/50’ pitching plate. • Lip Repair/Field Modification • Layout infield to dimensions. • Paint and stringline for lip removal and other uneven areas, approximately 22,000 sq ft. • Remove elevated areas and haul away debris. • Add soil as needed. • Grade to proper slope and prep for sod. • Furnish and install Big Roll Celebration Bermuda sod and roll with drum roller. • Loosen / Roto-till clay and grade infield to proper slope. Reshape pitcher mound and reset bases.