Specifications include, but are not limited to: Collierville Bus Lot; 1. Excavate and dispose of approximately 550 square yards of asphalt. Install 8” cement-treated base and 2” asphalt binder. Any deducted or added patching shall be calculated at the unit price listed on the pricing sheet. 2. Asphalt milling of entire lot (accessible areas) to a depth of 2”. 3. Proof-roll and mark soft spots for removal. Patch as needed per specs listed above. 4. Clean and prep the surface and then no more than 24 hours prior to paving, apply a CSS-1 tack coat at manufacturer’s suggested rates. 5. Install TDOT 411E asphalt wearing course to a compacted depth of 2”. Perform rolling in consecutive passes to ensure smooth finish with no roller marks. 6. Remove and re-pin six (6) concrete parking stops. Collierville Elementary (Areas as shown on map); 1. Excavate and dispose of approximately 100 square yards of asphalt. Install 8” cement-treated base and 2” asphalt binder. Any deducted or added patching shall be calculated at the unit price listed on the pricing sheet. 2. Asphalt milling to a depth of 1 ½”. 3. Proof-roll and mark soft spots for removal. Patch as needed per specs listed above. 4. Clean and prep surface and then no more than 24 hours prior to paving, apply a CSS-1 tack coat at manufacturer’s suggested rates. 5. Install TDOT 411E asphalt wearing course to a compacted depth of 1 ½”. Perform rolling in consecutive passes to ensure smooth finish with no roller marks. 6. Remove and re-pin fifty-five (55) concrete parking stops.