Specifications include, but are not limited to: ➢ The drinking fountain shall be Elkay model #LZOOTL8WSSK bottle filling station with bilevel ADA cooler, or suitable alternative. (Exhibit A) ➢ All costs shall include the following: 1. Removal and disposal of the existing drinking fountain 2. Any additional work necessary for the new units to be installed, such as plumbing, electrical, support/bracing, backing, or any other modification that is required to properly install each unit. 3. Shipping, delivery, installation, and testing of the new units. 4. Any finish work necessary to conceal or close any gaps or penetrations created from removal of previous drinking fountains, or that were required to install new units. This includes any wall, ceiling, or floor repair. Finish work includes any painting or surface repair to match original paint or surface. ➢ Contractor is responsible for cleaning up and removing any and all debris resulting from the work. ➢ Contractor will not be permitted to leave any items unattended in the detention area while work is performed and must clear all tools, material, debris or other items each day the work is ongoing to adhere to security restrictions. ➢ This purchase is being funded with a grant and is required to be completed by July 31, 2024.