Specifications include, but are not limited to: Schedule A (300 W) includes 243,000 SF of mill and 4,493 tons of bituminous concrete pavement from 5300 South to 5900 South. It also includes pedestrian ramp improvements, limited curb and gutter replacement and sidewalk/pedestrian improvements, and pavement striping. The sidewalk improvements include 2,050 square feet of new concrete sidewalk (5” thick). Schedule B (4800 S) includes 91,500 SF of mill and 1,700 tons of bituminous concrete pavement from the Frontrunner tracks to State Street. It also includes pedestrian ramp improvements, limited curb and gutter replacement and sidewalk/pedestrian improvements, and pavement striping. Schedule C (Vine Street) includes 394,340 SF of mill and 7,394 tons of bituminous concrete pavement from State Street to 5600 South on Vine Street. It also includes removal and replacement of curb & gutter and sidewalk from State Street to 900 East with added pedestrian crossing improvements as identified in the plans; and improved bicycle infrastructure and striping.