The Contractor shall fully renovate a total of 20 greenside bunker cavities in this project. Contractor will be responsible for reshaping the bunker on #14 green to eliminate surface flow from the green and surrounding area from entering and washing out the bunker. Contractor shall be responsible for removing existing sand, inspecting drainage tiles, and repairing any damage, installing selected bunker liner, testing installed bunker liner to ensure it conforms to company requirements, installing new sand, packing sand, and opening for play. Approximately 39,340 square feet of new bunkers shall be installed on this project. Sand Selection—Contractor shall select a tested sand from a local source that meets all United States Golf Association and patent company specifications for acceptable sand. Chosen sand shall be able to meet the specifications of a maximum slope of bunker less than eighty percent (80%) of the angle of repose. The Contractor shall present a sample of the bunker sand with testing results prior to installation and may be required to submit additional samples throughout the project. Pre-Approved sand providers are Golf Agronomics G Angle, Bulk Aggregates, Turf Materials (Premium White Sand of Arkansas), and Short Mountain Silica.