Specifications include, but are not limited to: ASPHALT ACCESS ROAD 1) The Contractor shall be responsible for all measurements and figures to ensure work is carried out and job is done in a timely and professional manner and to allow park to return to normal operation. 2) The Contractor shall make sure to call 811 and have all underground utilities located before work starts. 3) The Contractor shall provide temporary construction barriers and signage, as needed. 4) The Contractor is responsible for repair, replacement, or restoration of any damages to water lines, phone lines, utility lines, and park grounds at no cost to the State. 5) The Contractor shall seed and straw the area that was dug up during construction. 6) The Contractor shall take adequate provisions to protect the park personnel and park visitors throughout the duration of this job. ASPHALT 1) The Contractor shall lay approximately 500-feet of total of asphalt aggregate, from turn around leading up to the Indian mounds, area will be marked by the Park Manager and Facilities Supervisor. 2) The Contractor shall excavate approximately 124-feet of existing asphalt and prep approximately 376-feet of gravel to receive asphalt. 3) The Contractor shall widen the existing asphalt to approximately 20-feet filling the void space appropriate subgrade and binders. 4) The Contractor shall lay new asphalt replicating the width of gravel road approximately 12-feet. 5) The Contractor shall make proper preparation of subgrade in both areas that will be uniformly connected to receive asphalt in accordance with TDOT standards. 6) The Contractor shall dig a stormwater drainage area adding 4-12-inch gabion stone in marked location approximately 200-feet to ensure washout does not occur. a. The Contractor shall ensure that the minimal encroachment is to occur on either side of the asphalted road. 7) The Contractor shall install Two 16-inch x 20-feet culverts at marked locations for water runoff. 8) The Contractor shall install sleeving/conduit as required for utilities prior to final compaction. 9) The Contractor shall add 6-inches of aggregate subgrade on top of compacted subgrade, lay a prime coat on top followed by 2-inches of asphalt binder course (TDOT 307B), tack coat, and 1.5-inches asphalt surface course (TDOT 411E). a. Do not lay asphalt when weather conditions are unsuitable or until the base is thoroughly dry and has set for an appropriate amount of time. 10) The Contractor shall always follow all “OSHA” and “TOSHA” rules and regulations during this contract. 11) The Contractor will be responsible to repair, replace, or restore any damage to water lines, phone lines, utility lines, and park grounds at no cost to the state. 12) The Contractor shall seed and straw the area that was dug up or disturbed during the construction phase of the project. 13) The Contractor must make adequate provisions to protect the parks personnel and visitors throughout this project.