Specifications include, but are not limited to: Barr and Barr and Horus Construction, in association with Linbeck, are accepting bids on the MAC +Proton Project based on TSOI KOBUS DESIGN and its consultants’ Construction Documents in MoffitCancer Center – MAC + Proton Building at Speros, FL. 1. This Trade Contractor is to provide all labor, material, accessories, and equipment to furnish & install Metal Support Assemblies for the project in accordance with the plans, specifications, and contract manual. This includes and is not limited to: All channels, fittings, hardware, bracing and stamped drawings for this scope. i. Support assemblies included for the following rooms: 1. Digital Radiation C1134 – Overhead Rail System 2. CT-1 1305 – Support for Injector Arm 3. CT-2 1311 – Support for Injector Arm 4. PET-CT 1470 – Ceiling and Wall Mounted Positioning Lasers 5. Linear Accelerator 1541 – Positioning Lasers, Camera Mounts, Monitors, Vision RT System 6. Linear Accelerator 1541 – Support for Patient Lift System (if applicable) 7. CT-SIM 1512 – Support for Injector Arm and Vision RT Positioning System 8. CT-SIM 1512 – Support for Patient Lift System (if applicable) 9. MRI-2 1250D – MRI Grid (If needed, depends on Shielding Vendor) 10. MRI-3 1150D – MRI Grid (If needed, depends on Shielding Vendor) 2. Supply components required for anchorage of metal framing. Fabricate anchorage and related components of same material and finish as metal fabrications, except where specifically noted otherwise. 3. Provide and install mounting plates per equipment manufacturer’s requirements. 4. Install closure strips at exposed channels in ceilings installations. 5. Install items plumb and level, accurately fitting, and free from distortion or defects. 6. Verify dimensions onsite prior to shop fabrication. 7. Protection of adjacent surfaces. 8. Provide all fasteners, stiffener plates, clips, and clamps as indicated and required for a complete installation. 9. Coordination of Subcontractor’s Work and other trades as well as medical vendors. 10. Subcontractor to confirm layout with Contractor before beginning Work in each area.