1. This Trade Contractor is to provide all labor, material, accessories, and equipment to furnish & install RF Shelding for the project in accordance with the plans, specifications, and contract manual. This includes and is not limited to: a. Complete MRI Shielding System for (2) MRI Rooms. Includes Paneling, for Floors, Walls, and Ceilings. Also includes all RF Filters and Penetration Panels as required. b. Interior Support Structure for the facilitation of OH MEP in MRI Rooms. c. Sub Floor Installation or prep compatible with RF Shield System to allow for final flooring installation. d. RF Shield Door and Window System in each MRI Room. e. RF Testing of each room. Initial Test at completion of the Shield System and Final Test after equipment installation. f. Safety System on Door (Emer. Release) and Emergency escape hatch. g. Waveguides for MEP Systems and Quench. 2. Delivery, Unload, Inventory, and Staging of all material. 3. Subcontractor to Review and coordinate RF Shield Construction with the Primary Support structure (by Others.) 4. All Design and Detailing and shop drawing creation of RF Shielding Systems. Coordinate with Vendor provided Drawings. 5. Install items plumb and level, accurately fitting, and free from distortion or defects. 6. Verify dimensions onsite prior to shop fabrication. 7. Protection of adjacent surfaces. 8. Provide all fasteners, stiffener plates, clips, clamps, patches, RF Tape, or other miscellaneous material as indicated and required for a complete installation. 9. Coordination of Subcontractor’s Work and other trades as well as medical vendors. 10. Subcontractor to confirm layout with Contractor before beginning Work in each area. 11. Any required interlocks of Door to building security system. 12. This contractor shall stock their materials on-site only in quantities as needed per each phase. Stocked material must be coordinated with the construction manager. 13. All deliveries must be covered and kept clean. No material is permitted to be staged outdoors. All maintenance to protect will be by this contractor. 14. Owner Training and Video Demonstration of RF Shield System. 15. Furnish and installation of all Leaded Drywall and Leaded Plywood as shown on the Contract Documents. Include all back-shielding of penetrations. Price as an add alternate. 16. Furnish and installation of all leaded Doors, Leaded Frames, and Leaded Glass as shown on the contract Documents. Price as an add alternate. 17. Multiple mobilizations as required to meet the Project Schedule.