Specifications include, but are not limited to: GENERAL BUTLER STATE PARK ROAD - 1. Construct intermediate pipe anchor. 2. Level and wedge and resurface – 2.029 miles. 3. Construct guardrail above Butler Cemetery at geotech repair site. 4. Construct ditch across from Tennis Courts near Museum Entrance. OBSERVATION POINT ROAD - 1. Level and wedge and resurface – 0.311 miles. COTTAGE ROAD - 1. Level and wedge major depressions at 2 culvert points along the edge. Patch entrances to individual cottage areas designated by the Engineer, at the entrance points only, to improve turning radii. 2. Level and wedge and resurface one way couplet ending at the loop around the Campground Control Building – 1, 510 feet +1,760 feet = 3,270 feet. CCC MEMORIAL ROAD - 1. Level and wedge and resurface at the CCC Memorial 300 feet.