Specifications include, but are not limited to: reconfiguring the existing public wharf and dock facility on the Darien River,southwest of Skippers’ Fish Camp (85 Screven St, Darien, GA 31305). The existing floating dock (1,002.4 SF), ramp (82 SF) and a 278 SF section of walkway shall be removed and disposed of. The irregular portion of the walkway will be replaced with a 110 SF section to straighten the wharf walkway. A new 6’ X 86’ (516 SF) fixed walkway will be constructed directly channel ward from the westernmost fixed walkway. A 4’ X 30’ (120 SF) gangway will extend to the east to provide access to a new 10’ X 126’ (1,260 SF) floating dock (New Dock 1) that will be located approximately 15’ seaward of the existing fixed walkway. At the southern terminus of the fixed walkway will be a 4’ X 80’ (320 SF) ramp that will extend to the east to provide access to a 12’ X 123’ (1,512 SF) floating dock (New Dock 2) located seaward of New Dock 1. The dock is approximately 35.8’ from the adjacent dock to the east and 24.3’ to the adjacent dock on the west. The dock facility will extend approximately 119’ into the waterway where it is 311’ wide at MLW. The footprint of the modified public dock facility will be approximately 11,098 SF (0.25 AC) with new impacts to coastal marshlands totaling 2,438 SF (0.06 AC). Please see the attached Coastal Marshlands Protection Act Permit #830 (SAS-2003-09590), hereinafter referred to as “CMPA Permit #830”, of the proposed dock improvements for additional information.