Specifications include, but are not limited to: DEMOLITION: 1. CONTRACTOR SHALL USE CAREFUL CONSTRUCTION PRACTICES TO MINIMIZE DISTURBANCE OF ALL ITEMS TO REMAIN. 2. SITE CLEANUP AND DISPOSAL OF ALL DEBRIS AND UNSUITABLES GENERATED BY DEMOLITION ACTIVITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR. ALL DEMOLITION DEBRIS SHALL BE DISPOSED OF OFF-SITE PER LOCAL AND STATE REGULATIONS. 3. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO SURROUNDING PROPERTY AS A RESULT OF CONSTRUCTION ACTIVITIES. EROSION AND SEDIMENT CONTROL: 1. EROSION AND SEDIMENTATION CONTROLS ARE REQUIRED AS PART OF THIS PROJECT. SEE EROSION AND SEDIMENT CONTROL PLAN FOR CONTROL MEASURES. 2. EROSION AND SEDIMENTATION CONTROLS MUST REMAIN IN PLACE FOR THE ENTIRE DURATION OF THE PROJECT UNTIL EXPOSED SOILS HAVE BEEN STABILIZED AND APPROVED BY THE LANDSCAPE ARCHITECT AND TOWN OF GROTON. 3. CONTRACTOR SHALL INSPECT AND REPAIR E&S CONTROL DEVICES AT THE END OF EACH WORKING DAY AND AFTER EACH STORM EVENT TO ENSURE THAT THERE ARE NO GAPS OR DAMAGED AREAS. DAMAGED AREAS MUST BE REPAIRED IMMEDIATELY. 4. ANY SILT CAPTURED BY E&S CONTROLS AFTER RAIN EVENTS SHALL BE REMOVED AND RETURNED TO THE SITE. 5. EROSION CONTROL MATTING IS REQUIRED ON ALL SEEDED SLOPES GREATER THAN 1:6. 6. ALL EXISTING CATCH BASINS TO REMAIN MUST HAVE FILTER BAGS INSTALLED PRIOR TO MOBILIZATION. 7. HAY BALES MUST BE USED IN ALL AREAS WHERE SILT FENCE IS NOT FEASIBLE OR CANNOT BE INSTALLED DUE TO SUBSURFACE OBSTRUCTIONS. 8. INSTALL CONSTRUCTION ANTI-TRACKING PADS AS SHOWN ON THE PLANS. 9. ALL SOIL STOCKPILES MUST HAVE E&S CONTROLS INSTALLED ENTIRELY AROUND THE STOCKPILE TO PREVENT SEDIMENT FROM ESCAPING DURING RAIN EVENTS AND COVERED TO PREVENT EROSION BY WIND. 10. DURING PERIODS OF DROUGHT, EXPOSED SOILS NOT STABILIZED SHALL BE IRRIGATED TO PREVENT EROSION BY WIND. 11. THE CONTRACTOR MAY INCUR FINES IF E&S CONTROLS ARE INSPECTED BY THE TOWN OR STATE AND FOUND TO BE MISSING, DAMAGED, OR NOT CONTAINING SEDIMENT ON-SITE. 12. THE TOWN OF GROTON SHALL PROVIDE A VACUUM TRUCK TO REMOVE DEBRIS FROM THE CATCH BASIN SUMPS PRIOR TO THE START OF CONSTRUCTION. ALL SUMPS SHALL BE CLEANED BY THE CONTRACTOR PRIOR TO DEMOBILIZATION FROM THE SITE.