Specifications include, but are not limited to: 1. The Contractor shall be responsible for instructing employees in safety measures considered appropriate. Personnel will not place or use mops, brooms, or any equipment in traffic areas or other location in such a manner as to create safety hazards. The workers shall provide, place and remove appropriate warning signs for wet or slippery areas. 2. Work shall be performed on a normal five (5) day week schedule, Monday through Friday. The Contractor shall adjust his/her schedule of duties due to the hours of Board employees and Classroom instruction periods. No work is to be performed during the normal school hours which may in any way interfere with the general operations and functions of the Schools. Contractor will provide services for all extra curricular activities as stated on the District calendar. Contractor should make note of all items stated on the District calendar. 3. At no time will the Contractor have all lights turned on in a building. As each room is completed, all lights are to be turned off. Prior to leaving the building and/or completed sections of buildings, it shall be the responsibility of the successful proposer to see that all lights are out, all windows are closed and locked, all doors secured, and the alarm system turned on, unless otherwise directed. Notify the Facilities and Maintenance Manager of any irregularities. 4. The Contractor will prohibit his employees from disturbing papers on desks, opening drawers or cabinets, and using telephone or office equipment located in any offices or classrooms. 5.. Contract custodians will be required to have training in areas such as school lock down, alarms, bodily fluid clean up, and sexual harassment. 6. The Contractor will be expected and required to follow all Centers for Disease Control (CDC) cleaning requirements, included but not limited to frequent disinfecting of all high-touch surfaces. The services provided must meet or exceed the CDC Environmental Cleaning and Disinfection Recommendations. Furthermore, the Contractor shall provide a copy of their COVID-19 cleaning Standard Operating Procedures (SOP).