The removal and construction of two irrigation diversions (diversion 1 and diversion 3). The diversions will be constructed in a manner that allows for fish passage and screened to prevent the entrainment of fish within irrigation canals. Diversion 1 Location: Diversion 1: 41.913023, -113.742104 Remove existing diversion structure. Install pre-cast concrete intake structure and headgate. Place pipe to connect to pre-cast concrete wet well. Realign and grade stream. Once the materials are obtained, installation should take approximately 3-4 weeks. Work can begin as early as the project is awarded. Diversion 3 Location: Diversion 3: 41.888056, -113.741944 Manufacture rotary drum screen. Remove existing diversion structure. Install pre-cast concrete intake structure, headgate, screen, and water bypasses. Realign and grade stream.