1. ELEVATOR A. HYDRAULIC ELEVATOR: i. PUBLIC ELEVATOR WITH TWO (2) STOPS 2. MODERNIZATION OF ELEVATOR CONSISTS OF THE FOLLOWING ELEMENTS: A. ALL DRAWINGS TO ALLOW OWNER PROPER REVIEW. B. CONTRACTOR TO REPLACE WITH NEW: i. DRIVE MOTORS AND GEARS (WHERE APPLICABLE) ii. MOTOR DRIVES iii. HOIST MECHANISM (BELT OR OTHER) iv. SAFETY DEVICES v. SHEAVES vi. GOVERNOR vii. BRAKES viii. HEAVY DUTY DOORS OPERATORS ix. CAB EQUIPMENT/ACCESSORIES (DOOR CONTROLS, SAFETIES, CLUTCHES, TRACKS, EMERGENCY COMMUNICATION, ETC) x. REFURBISH HOISTWAY DOORS AND EQUIPMENT IN THEIR ENTIRETY xi. PIT SWITCHES AS APPLICABLE xii. ROLLER GUIDES AS APPLICABLE xiii. CAR OPERATING PANELS xiv. CAR POSITION INDICATORS xv. HALL/CALL BUTTONS AND POSITION INDICATORS xvi. HOISTWAY ACCESS KEYS SWITCHES ON TOP AND BOTTOM LANDINGS xvii. WIRING AND SAFETY DEVICES xviii. EMERGENCY BATTERIES TO OPERATE ELEVATOR TO NEXT FLOOR DURING A POWER INTERRUPTION xix. WIRING AND HARNESS TO ADD KEY ACCESS CONTROL TO ELEVATOR xx. EMERGENCY STOP CONTROLS xxi. SEALS ON HYDRAULICS xxii. HYDRAULICS PUMP xxiii. HYDRAULICS FLUID 3. CONTRACTOR SHALL INCLUDE IN THE COST OF THE FOLLOWING: a. LABOR b. DUMPSTER COSTS c. COSTS OF THE OFFICE OVERHEAD d. ALL NECESSARY EQUIPMENT AND TRANSPORTATION e. ALL FIELD COSTS ASSOCIATED WITH THE WORK. f. TWO YEARS OF LABOR AND PARTS WARRANTY AND TWO YEARS OF PLANNED AND PREVENTIVE MAINTENANCE (PROPOSAL SHALL IDENTIFY THE ELEMENTS OF THE MAINTENANCE PLAN) 4. CONTRACTOR SHALL MAINTAIN SAFE WORKING CONDITIONS AS THIS IS A FUNCTIONING OFFICE FACILITY. 5. WORKING HOURS ARE 8 AM - 5 PM MONDAY THRU FRIDAY. OR AS ADDITIONALLY APPROVED IN ADVANCE. MUST CALL TO SCHEDULE AN ON-SITE VISIT PRIOR TO BIDDING.