The Contractor shall fully renovate a total of twenty-nine (29) greenside bunker cavities in this project. Contractor shall be responsible for removing existing sand, inspecting drainage tiles, repairing any damage, installing a new bunker liner, testing installed bunker liner to ensure it conforms to requirements, installing new sand, packing sand, and opening for play. Approximately 34,240 square feet of bunkers shall be renovated on this project. Sand Selection—Contractor shall select a tested sand from a local source that meets all United States Golf Association and patent company specifications for acceptable sand. Chosen sand shall be able to meet the specifications of a maximum slope of bunker less than eighty percent (80%) of the angle of repose. The Contractor shall present a sample of the bunker sand with testing results prior to installation and may be required to submit additional samples throughout the project. Pre-Approved sand providers are Golf Agronomics G Angle, Bulk Aggregates, Turf Materials (Premium White Sand of Arkansas), and Short Mountain Silica.