The Contractor shall fully renovate a total of thirty-five (35) greenside bunker cavities in this project with four (4) bunkers (#5 Rear bunker, #9 rear bunker, #14 rear bunker, #18 rear bunker) being eliminated and two (2) bunkers (#14 front bunker and #16 front bunker) being reduced in size by at least 1/3 existing size. Contractor shall be responsible for removing existing sand, inspecting drainage tiles, repairing any damage, installing selected bunker liner, testing installed bunker liner to ensure it conforms to company requirements, installing new sand, packing sand, and opening for play. Approximately 23,630 square feet of new bunkers shall be installed on this project and approximately 6,483 square feet of bunkers eliminated, shaped, and sodded. Eliminated bunkers-Contractor will be responsible for removing existing sand in bunkers, removing existing turfgrass as needed, filling and packing cavity and shaping the new area as to blend the filled bunker into the existing terrain in a safe and efficient manner. Contractor will sod area with turfgrass matching the surrounding turfgrass. Sand Selection—Contractor shall select a tested sand from a local source that meets all United States Golf Association and patent company specifications for acceptable sand. Chosen sand shall be able to meet the specifications of a maximum slope of bunker less than eighty percent (80%) of the angle of repose. The Contractor shall present a sample of the bunker sand with testing results prior to installation and may be required to submit additional samples throughout the project. Pre-Approved sand providers are Golf Agronomics G Angle, Bulk Aggregates, Turf Materials (Premium White Sand of Arkansas), and Short Mountain Silica.