Specifications include, but are not limited to: The project consists of the removal and replacement of the waste, vent, and domestic water piping system serving the kitchen and dishwashing areas. All piping, drains, and plumbing fixtures in the kitchen and surrounding areas shall be removed and replaced. Ceilings, floors, and walls will be removed and replaced to accommodate the piping replacement. Light fixtures and receptacles will be removed and replaced. A new concrete slab and epoxy non-slip floor shall be provided in the renovation space. All existing kitchen equipment shall be removed, stored, and re-installed to accommodate the renovation. Temporary kitchen trailers and storage containers shall be provided to serve as the facility kitchen while the permanent kitchen is shutdown. Trenching and backfilling will be required for installation of utilities to serve the temporary kitchen rental trailers. All work will be performed inside the facility perimeter Security fence.