Specifications include, but are not limited to: • The facility is located at 5624 South Cougar Lane (4800 West) in Kearns, Utah. • The project will consist of constructing the grade beam, conduit for data and electrical, installation of air handling unit and back-up generator (including electrical and gas), electrical for lighting, drainage, decking, installation of melting mats under some of the decking, removal of a dirt hill for a level deck, stairs, etc for the installation of a seasonal air supported membrane structure over our existing outdoor recreation pool. The structure will be approximately 16,000 sq.ft. • Arizon Building Systems will be supplying the actual air supported membrane structure, air handling system and backup generator • Construction drawings are included and explained in the preproposal conference/site visit • The air supported dome structure will be used seasonally in the Fall, Winter and Spring and must have the ability to be removed for the Summer season. • The facility will not be available to do onsite work during our summer season (Memorial Day weekend through Labor Day weekend), so this portion of the project must be completed by May 22, 2024 so we can have our summer season and then install the air supported structure right after Labor Day. • Ability to work around other contractors completing other work in the area. • The ideal successful firm will use the provided designs, drawings, to do the labor, provide materials, permits, tools, equipment and insurance necessary but not limited to completing the Grade Beam for Air Supported Dome Structure project.