Specifications include, but are not limited to: 1. Preparation: • Inspect and clean the designated roadways to ensure they are free of debris, vegetation and loose materials. • Repair any existing pavement defects, such as cracks and potholes, using approved methods. • Implement traffic control measures per MUTCD requirements to ensure the safety of workers and the public during construction. 2. Slurry Seal Application: • Apply a high-quality slurry seal mixture to the designated roadways as per the APWA specifications. • Ensure an even and consistent application of the slurry seal to achieve the desired surface characteristics. • Work closely with the project manager to meet any specific requirements related to aggregate type, mix design, and application thickness. 3. Traffic Management: • Develop and implement a comprehensive traffic control plan to minimize disruptions to local traffic flow. • Clearly communicate construction schedules, road closures, and detours to the public 48 hours in advance. • Coordinate with the Roads Department to obtain any necessary permits for traffic control...